This machine line is with: 1. Bottle Cap Pre-heating machine 2. Bottle Cap Removal machine ( Decapping ) 3. Bottle Leakage hunting machine 4. Bottle outside pre-washing machine 5. Bottle Loader machine 6. Bottle Cap Sterilizing and loading machine 7. Bottle Washing, Filling and Capping Machine 8. Bottle shrink tunnel sealing machine 9. Bottled water lifting and sealing machine 10. Finished bottled water output conveyor All of the above machines and auxiliary equipments should be connected together , and they can perform full-automation in operation and processing. Designed for : Mineral water , purified water , distilled water or any other still water filling . Bottle Volume: 11.34 ~ 22.68 liter bottle ( 3 & 5 Gallon ) Processing Station: 1. Bottle cap pre-heating 2. Bottle cap removal ( decapping ) 3. Bottle leakage hunting 4. Bottle outside pre-washing 5. Bottle loading 6. Bottle inner washing with hot water (from built-in heating tank) 7. Bottle inner washing with hot water (from built-in heating tank) 8. Bottle inner washing with recycled water 9. Dripping 10. Bottle inner washing with purified / mineral water 11. Bottle going down and discharge 12. Bottles filling 13. Bottle Capping ( Cap sterilizing and loading) 14. Bottled shrink tunnel sealing 15. Bottled water lifting and sealing machine 16. Bottled water finished output conveying